Customization: | Available |
---|---|
Material: | EPDM |
Application: | Car |
Still deciding? Get samples of US$ 0.1/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Product | Name | rubber product |
Material | NR,NBR,SBR,EPDM,etc | |
Applications | Automotive,industrial,machinery,military,electrial,medical,household,etc | |
Size | According to drawing | |
certificaton | ISO9001:2015 | |
Color | natural,black,,or as per client's samples or requirements | |
Shape | caple of all shapes as per drawing | |
Hardness | 20ºC~90ºC Shore A,usually 30ºC~80ºC Shore A | |
Delivery time | 20-30after payment received | |
MQQ | 1000pcs | |
Temperature | -40ºC~+300ºC | |
Free sample | Yes | |
Package | As your request | |
Market | Europe,America,Ocenia | |
QC | Every order production will get more than 10 times regular tests and 5times random check by our professional QC.Or by Third Party appointed by customer. |
Mold | Molding process | injection molding,mold processing,extruson |
Mould type | processing mold,injection mold,extrusion mold | |
Machines | 350T vacuum pressing machine at 300T , 250T and so on | |
Tooling equipment | rubber tension tester,Rubber vulcanization instrument,Durometer,calipers,ageing oven | |
Cavity | 1~400 cavities | |
Mould life | 300,000~1,00,000 times |
production | Production capacity | finish each mold of product in 2.5 minutes and working on 2 shafts with 24 hours |
Mold lead time | 10~30 Days | |
Sample lead time | 3~5 days | |
Production time | Usually 10~30Days,should be confirmed before order | |
Loading port | Shanghai |
Q: Are you manufacture or trading company?
A: We are manufacturer.
Q: How to get the fastest quotation?
A: Send an email with drawing directly.
Q: How to get qutation without drawing?
A: Possible send sample,pictures or detail descriptions of products to us,we will return drawing for confirm.
Q: How about samples?
A: Free samples is available for your quality,but you should pay the freight.Regarding customise products,sample and mould order will go first before mass production.